logo

SAP Services

SAP Rollouts, Upgrades, and Basis Delivered Without Disruption

Candent designs and delivers global SAP templates, country rollouts, and technical upgrades for enterprises that can’t afford disruption at go-live.

What We Deliver

Every Layer of a Global SAP Rollout Program, Owned by One Team.

Global Template Design and Governance

Core model design, process standardization, and template governance built to hold across business units and geographies.

Country and Regional Rollouts

Localization for statutory requirements, tax configurations, payment formats, and regulatory compliance across India, APAC, and North America markets.

Technical Upgrades and System Conversions

SAP technical upgrades, Support Package stacks, kernel updates, and system conversions planned and executed with zero-surprise cutovers.

Basis Architecture and Operations

System sizing, landscape architecture, transport management, and performance tuning across on-premise, cloud, and hybrid SAP environments.

Integration and Localization Connectivity

Country-specific EDI, e-invoicing, payment formats, and B2B connectivity built alongside the rollout — not handed to a separate team after go-live.

Post-Rollout Stabilization and AMS

Hypercare, incident triage, and structured handover to Application Management Services, run by the same team that delivered the rollout.

Designed For

Three Programs Where This Work Makes the Difference.

Candent’s rollout and upgrade practice is structured for organizations in one of these situations:

Multi-country rollout from a global template

The core SAP program is complete. Now the business needs to roll it out across five countries in three regions, each with its own statutory, language, and operational requirements. The template needs to hold. The country teams need to deliver on time.

Technical upgrade ahead of a major transformation

The S/4HANA migration or BTP extension program cannot begin until the existing landscape is on a supportable technical baseline. Upgrade scope, regression risk, and Basis readiness need to be assessed and managed before the transformation clock starts.

Unplanned rollout complexity or Basis instability

A rollout has stalled because localization scope was underestimated. Performance issues in production are traced to Basis configuration decisions made during implementation. The team needs experienced architects who can assess the problem and fix it.

Our Approach

Rollout Scope Is Agreed Before a Single Configuration Sprint Begins

Every rollout and upgrade engagement starts with a structured assessment. Template quality, country-specific gaps, Basis landscape health, and upgrade risk are reviewed before the program plan is fixed.

Candent’s assessment covers

From assessment to go-live, the program scope reflects what the business actually needs to deliver.

Why Candent for Rollouts, Upgrades and Basis

The Same Team Designs the Template and Runs Basis

Rollout programs fail when template governance sits with one team, Basis architecture with another, and country delivery with a third. Candent runs these as a single integrated practice. The SAP functional consultants, Basis architects, and integration team work on the same program, under the same governance.
When the rollout goes live in country six, the team that built the template is still in the room.

Often Used Alongside

Built to Connect With Your Wider SAP Program

Most rollout and upgrade engagements connect directly to adjacent workstreams. Clients running country rollouts frequently combine this with Integration Services for country-specific EDI, payment, and B2B connectivity. Technical upgrades often precede or run in parallel with S/4HANA transformation programs.

SAP S/4HANA Transformation

SAP Integration Suite and B2B / EDI

SAP Application Management Services

CoE-as-a-Service

Running a Rollout Program That Needs One Team to Own the Whole Scope?